Wednesday, 4 September 2013

Summer 2013 - has the house kept its cool?

I have been asked this question throughout the summer. Last summer was so cold that we were not able to assess how well the building performs in hot weather.

Unfortunately, we don't have data loggers or similar equipment to provide lots of quantitative data. That said, July was our warmest month with temperatures in the high 20s (Centigrade) and from memory hitting 30C on one or two days. The house remained comfortable thoughout nearly all of that period within internal temperatures between 22C and 25C. We did have one day when the temperature in my home office (which has a PC with two monitors, one of which is quite old and gives off significant heat) reached 27.5C and it did feel a bit too warm. Other rooms in the house felt quite comfortable throughout.

Our cooling strategy

Site constraints meant that we needed more east and west glazing than one would have in an "ideal" Passivhaus. This meant needing to use external blinds or similar, not an overhang type shading device which is possible on a south facing window because the sun is lower in the sky in morning and evening. So....
  1. We chose to fit Internorm windows with integral blinds - see below - this was a solution specific to our local circumstances, as the window is not a true triple glazed window, consisting of a sealed double glazed unit, and internal venetian blind and a third pane on the outside of the blind: 2 + 1. The blind is in a ventilated space. This means that they have a whole window U-value of only 0.93W/m2K, less than would be needed in many parts of the UK. Internorm do a 3 + 1 window, with a lower U-value but it is considerably more expensive, very heavy and they use Krypton, which is best avoided (more expensive/rare and - when it leaks out as it will after about a decade - results in a more greater drop in performance than Argon-filled units. All the windows on solar gain facades have high g-value glazing (60%), so they will capture 20% more heat than typical 50% g-value triple glazed units. This means that remembering to use the blinds is key to keeping the house cool. This can be solved by using automation but this seems like a step too far in complexity in a domestic situation; although perhaps it is a good idea in an office building.


  2. We have to sliding pation doors, one on the east and on the west facade. These are "traditional" triple glazed. We planned two pegulas to provide seasonal shading on these two quite large glazed components. Unfortunately, we haven't got the pergulas in place yet, so we did get more solar gain than is ideal. I don't know how much impact this is having on the overall summer performance of the building. When I modelled it in the PHPP, it does affect the frequency of overheating and, had the pergulas been completed before this summer's not spell, we might have avoided the slight overheating on a day or two in July.
  3. We do of course open our windows in the summer and I tried to keep the windows closed in the hot portions of the day (to help keep the heat out) and to make sure the windows were open at night. I think that if we were located in London (where night time temperatures don't drop as much), night time flushing would have been much less effective.
During the warm spell, I experimented with swiching off the MVHR at certain times of the day. Our intake (and exhaust) terminals are on the west facade wall. During the morning, when the west is in shade, I noticed that the MVHR seemed to help to maintain a lower temperature, as it was drawing in cooler air from outside. In the afternoon, it was drawing in warmer air and this possibly caused internal temperatures to warm more than might otherwise been the case. I tried switching off the MVHR in the afternoon but this seemed to make it feel less comfortable in the afternoon. I think that the reduced air change rate may have resulted in higher internal relative humidity levels, adding to thermal discomfort.

More generally, we have noticed that the house is more sensitive to internal heat loads than a typical UK home. Some of this is modelled in the PHPP but, in real world use, occupants may bring older electrical equipment, which will add to overheating risk. In my case, the old computer screen does give off significant heat and, although it is smaller than the newer one, uses more electricity. I don't think, however, that it makes economic or ecological sense to replace a perfectly good computer monitor.

Lessons learnt from this summer
  1. Keep the MVHR running. Although it provides no cooling function (a common misconception amongst some Passivhaus sceptics), the regular air changes it delivers moderates internal relative humidity.
  2. Use the blinds.
  3. Consider the impact of internal gains - heat emitting devices will have a surprising impact.


Friday, 22 February 2013

Totnes Passivhaus at Ecobuild

Authors of the Passivhaus Handbook, Janet Cotterell and Adam Dadeby, will be speaking at Ecobuild on 5th March 2013.

Slot 1 – first 20 min presentation within 12.30 – 14:00 session – retrofit and new-build case studies – seminar room 1 – “Passivhaus – using Passivhaus to help obtain planning consent … ” see http://www.ecobuild.co.uk/seminars/session/passivhaus/91/tuesday-05-march/seminar-room-1.html

Slot 2 – last 20 min presentation within 15.45 – 17:00 session – “Totnes Passivhaus: exemplar retrofit to Certified Passivhaus standard” – seminar room 8 – “Self build and renovation” – see http://www.ecobuild.co.uk/seminars/session/sustainable-self-build-and-renovation/79/tuesday-05-march/seminar-room-8.html

The Passivhaus Handbook will also be for sale at the RIBA Bookshop stand - S1230 and S1330 in the South Hall of Excel.

Wednesday, 24 October 2012

The Passivhaus Handbook

The Passivhaus Handbook, A practical guide to constructing and retrofitting buildings for ultra-high energy performance is published tomorrow (25 October 2012). The book expands on the topics discussed in this blog.



The Passivhaus Handbook has been getting good reviews:

‘Passivhaus construction looks like becoming not just popular in the UK, but commonplace. This is a no-nonsense and engaging introduction on how to do it.’
Kevin McCloud, presenter of Channel 4′s Grand Designs

‘This book gives a wonderful overview of Passivhaus in the UK today, not only enabling interested parties to understand the principles and pitfalls for their own projects, but also for policy makers and planning officers to understand how to avoid some of their ‘own goals’ in attempting to encourage conservation.’
Peter Warm, Passivhaus Certifier, WARM Low Energy Building Practice

‘I have now recommended your book to our four individual current Passivhaus clients wanting to build a Passivhaus. Your book will save me hours and hours of having to explain the principles of what we are trying do, to first time clients on a steep PH learning curve.’
Andrew Yeats CEPH Architect, Eco Arc Architects

‘I’m delighted to see everything about Passivhaus and its application in the UK collated for the first tiime, in The Passivhaus Handbook. The first-hand experience of the authors provides an excellent grounding for the book.’
Jon Bootland, Chief Executive, Passivhaus Trust

Here is the description of the book from the Green Books website:

The Passivhaus Handbook is an essential guide for everyone wanting to realise a supremely comfortable, healthy and durable home with exceptionally low energy costs. Whether you are building an extension, retrofitting your house or starting from scratch; are new to low-energy design or already have some experience, this book will help you navigate around the potential pitfalls and misconceptions. It brings together current thinking and best practice.

Passivhaus design focuses first on getting the building fabric right, to achieve ultra-low energy consumption in the most cost-effective manner. The approach is relevant to a wide range of building types and climates, not just to special structures. Passivhaus methodology can be combined with elements of other building standards, such as the UK’s Code for Sustainable Homes, or with other goals, such as a commitment to use low-impact and natural building materials.

This book includes:

  • A clear explanation of the underlying building physics.
  • Detailed information on key elements: avoiding air leakiness, designing out thermal (cold) bridges, moisture management and ventilation strategy.
  • Tips for creating a cooperative, motivated project team.
  • Photographs and diagrams throughout.

With steeply rising energy prices, uncertain climatic changes and straitened economic times, the Passivhaus approach, proven over 20 years, offers a timely and practical response.

The Passivhaus Handbook is available from Passivhaus Store as well as from online retailers. I hope you find it useful.

Sunday, 23 October 2011

We get our Passivhaus Certification

This week we had a little ceremony to mark getting our formal Passivhaus Certification. Rob Hopkins, of the Transition Network, kindly came to handover our newly gained certificate.
 


We have now been in the house just over two months and we are "looking forward" to a decent winter, to give the house a bit of a test. We are probably going to want to make some adjustments to our ventilation, once we have started using it to transport the small amounts of heat around the house. More on this in a future post.


From left to right: Janet Cotterell - Passivhaus architect, me - Passivhaus energy modelling (and client), Jonathan Williams - Passivhaus builder, Joe Bellows - one of the Passivhaus contractor team, Peter Warm - Passivhaus Certifier.

Wednesday, 28 September 2011

Living in a Passivhaus, the first few weeks

We have been living in the completed Passivhaus Home since 19 August and are really looking to seeing how the house will perform this winter. So far, the temperature internally has been pretty constant. The only time we had some overheating was over the weekend of 10th and 11th September, when we took part in the Open House event. We had over 150 people visiting and there were a lot of people in the house adding to the heat gain noticeably. It was warm, humid and windy outside (unusual weather) and we found that the tilt and turn windows, some of which we had tilted open to provide extra ventilation and cooling kept blowing closed in the wind.

We are still tweaking the settings on the MVHR unit (heat recovery ventilation unit). The MVHR is designed to recover the heat from the old, outgoing air and give it to the new, incoming air. Of course, during warmer summer weather, this is the last thing you want. So MVHR units are designed not to recover any heat when this is not needed.

The heat recovery was kicking in when it was not needed. We have tweaked the settings so that it only comes in at 18C (the minimum temperatures allowed) and turns off if the temperature reaches 20C. The picture above, which was taken a few minutes ago, shows that the summer bypass is enabled, which means that it isn't recovering heat - a bit counter intuitive.I must say that the user interface needs a little improvement. There's definitely a little product development work for Paul here. I feel that this is an often ignored part of a product's design. An impatient user might have decided just to switch the unit into standby until the weather got cold enough for the heat recovery to be needed, which would have defeated the purpose of the system. That said, once set up correctly, we shouldn't have to fiddle with this again.

Our hot water system has an even less user-friendly interface. Although this is not a Passivhaus specific issue. I think Passivhaus buildings need as much thought to go into how easy they are to use as goes into the design and construction of the fabric. Although not a problem for us and probably for other early adopters in the UK, it will have an impact on the way Passivhaus is perceived.

Friday, 22 July 2011

Certification airtightness test

Note: since posting this, the completed air test documents show a result of 0.2 air changes per hour.

It's been a while since I've posted during the always-longer-than-the-client-expects period where all the finishing work is completed.

We have started the process to get Certification as a Passivhaus, using the UK's top certifier and general guru on all things building physics related, Warm Low Energy Practice. Yesterday, Paul Jennings ("doorfanman"), our airtightness consultant completed the official airtightness test and we got:

0.19 air changes per hour!

This is a really big improvement on April's test. Partly because I calculated the internal volume more accurately, using Bluebeam, which has a great tool for measuring dimensions, areas etc of PDF plans. Our internal ventilation volume is 442.38m³ and the April test had been based on a rougher calculation of 400m³. Mostly though, the information from the April test helped us to to improve the weak areas.

It will be interesting to see how durable our result is. We believe we have created an airtightness layer which lasts.

I had already put up a DIY shelf in one of the rooms before yesterday's test was conducted, which required drilling a few holes into the plaster than forms the airtightness layer in the external walls of the refurbished part of the house. I put some sealant into the holes before inserting raw-plugs. Obviously, I will be aware of the need not to drill holes in the original external walls without thinking about airtightness. In the new build section, where the airtightness layer is beneath a 50mm service void, I will not have to worry nearly as much about affecting airtightness. For this reason, in any new build, I would always want to design in a service void. I think that, in the real world, it stands a much better chance of remaining intact over the design life of the building.

Next week, our MVHR (heat recovery ventilation unit) will be commissioned. This will involve, amongst other things, calibrating the airflow to each supplied room (and from each extracted room) to:

a) ensure that there is an appropriate air change rate for the use of the room
b) ensure that sufficient heat is delivered to the rooms (the tiny trickle of heat needed in a Passivhaus is delivered via the supplied air in the ventilation system)
c) ensure that the total rate of air supplied equals the total rate of air extracted. This is important because if the two are not in balance, the MVHR wastes electrical energy and because it results in the house being slightly over or under pressure, it will increase the flow of air through the fabric of the building.

Wednesday, 6 April 2011

0.4 air changes per hour!!

Our airtightness test went really well yesterday. The team achieved a fantastic result of just around 0.4 a.c.h., probably a bit lower, based on an internal ventilation volume of 400m3 - all the more impressive as this is the first build of this type they had worked on, and because more than half of the build is retrofitting the original structure.


We should be able to improve on that figure in the final test needed for Certification, as we were able to identify the relative weak points.

We spent a little time today working out how much extra time we spent into doing tasks that were necessary to achieve it. Our conclusion was that it was not a significant extra task. However, everyone in our team are really committed to paying attention to protecting the airtightness layer. We have not had to have a formal "Airtightness Champion" trying to watch everyone constantly, in case it was damaged.

Watch a clip of the airtightness test on YouTube: http://www.youtube.com/watch?v=nMTLfj4iXec

Monday, 4 April 2011

First airtightness test

Tomorrow (5th April) is a big day for the project. Paul Jennings from ALDAS, will be conducting our first airtightness test. We have been preparing for the day by going through the whole building to ensure there are no forgotten gaps or holes.

All the windows are now in and although there are still snags and issues to be resolved, they all close well enough for the airtightness test. In the refurbished part of the house, the windows are mounted on the ouside of the original walls with the external insulation wrapping around the window frames to minimise the thermal bridging around the window edge. This also minimises the area of window frame, which helps aesthetically and improves the energy performance of the window installation because window frames are generally the poorest performing part of the window. The photo below shows a section of a window with the first of four layers of insulation attached around it.


The next photo shows another section of window with all 180mm of phenolic foam in place. The work to cut and attach the insulation was time-consuming and really unpleasant for the team -  the stuff makes you really itchy. The job was made more difficult because Kingspan would not supply their product in broad sheets of 100mm and 80mm depths. Instead we had thinner (40mm and 50mm) and smaller area sheets. This meant much more glueing and cutting. We have also had to use more of the fixings than would have been needed with the broader sheets. Thank you Kingspan.



In the photo below, the airtightness tape is being applied to along the base of the window, forming a seal between the window frame and the previously parged internal window reveal. We probably have not approached this very well, as the process took longer than expected and was very fiddly. Because the parge layer was rougher than is ideal, we felt we needed to use an adhesive primer in addition to the Tescon Profil tape. It was hard to control what then becomes a very sticky combination of materials! We will need to check back with suppliers, Ecological Building Systems, to try to do it better next time.


We have two large service penetrations into the roof: for the soil vent pipe (SVP) and for the flue. We are using a small gas boiler, which modulates down to about 4kW, to provide our winter hot water - solar thermal will deliver the rest - and any residual heating we may need in the coldest weather. As well as an airtightness issue, SVPs and flues create a potential thermal bridges. The flue has a pair of concentric pipes, the inner one to vent exhaust gases and an outer ring to take in air to the boiler for the combustion process. The flue runs through a grommit/Intello, past 350mm of Warmcel, 22mm of Steico wood fibre board and through the Solitex roof underlay. It could therefore, unless insulated around the pipe within the house, be a significant thermal bridge. We are planning to enclose it, and the SVP, which presents similar issues, with sheep's wool insulation within the boxing. The lack of a need for a flue in an electricity based heating system, i.e. a heat pump, makes gas a less attractive option in a Passivhaus. However, I must admit that the extra cost of a heat pump based solution put me off a bit when we were at the design stage. The Passivhaus Institute are keen to encourage manufacturers to develop and sell "compact units". These have about the same footprint as a fridge freezer - so are super space efficient - and combine the MVHR, hot water (DHW) and space heat product functions in a single unit. One, the Compact P made by Danish manufacturer Nilan, has been Certified by the Passivhaus Institute, and is being promoted in the UK. It looks quite promising, however, most combined devices don't deliver the same performance as the "separates" units would. Our MVHR unit is almost twice as electrically efficient as the Nilan Compact P. And I think compact units need to be completely modular in design, so that parts that fail can be replaced independently of the rest of the machine. The other argument in favour of using heat pumps for DHW and space heating is that they will be better in climate/CO2 terms than gas, as the renewables portion of the electricity grid mix grows. I think that in another five or ten years, the balance - and the economics - may well have shifted in favour of heat pumps and I hope compact units.

 
We also have two large penetrations for the heat recovery ventilation (MVHR) unit's intake and exhaust ducts. The ducts themselves are 160mm but are wrapped in 125mm of insulation, making the penetrations 410mm each! This photo is from the inside, where the ducts meet the airtightness barrier, which in this part of the building is the internal plasterwork (parge coat). The walls are still to have their finishing layers of plaster, which will encase the grommit, intello and tescon tape. The continuation of the ducts will also have 125mm of insulation right up to the insulated surround of the MVHR unit.

Wednesday, 9 March 2011

Budget and payback

It is about time I talked about how much all this is costing. So far we have managed to keep close to our estimated budget and schedule. At this point, it is looking like the build costs, excluding VAT and professional fees, will come out at £1500 per m², which, given that we are having a high standard of internal finish (hardwood floors, granite worktop, decent taps and appliances etc) is not unreasonable. If you strip out the Passivhaus elements, it would have costed £1200 per m².

I think we have learned a lot about how we will approach new Passivhaus builds to bring the cost differential as close to £0 as possible. This is something we are looking at now. For this project, the extra cost will pay for itself easily over the time I hope to be living in the building, especially now that fuel prices are shooting up - very small increases in energy prices have a disproportionate effect in shortening the payback period. There will be many other non-energy benefits for us - better air quality, much more comfort (no cold drafts or 'cold radiant') and less noise from outside, no radiators on the wall taking up valuable space, loads of natural light, cooler summer temperatures - I think all those must be worth something.

Other Passivhaus Refurbs

Passivhaus refurbs are like London buses, you wait for ages for one, then suddenly three in a row come along. The other two projects are both part of the Retrofit for the Future scheme.

First, is the Princedale Road refurbishment of a Victorian Terrace in Holland Park, West London. The building is owned by a social landlord, Octavia Housing. It gained its Passivhaus certification on 1st March from Peter Warm, making it officially the UK's first refurbishment to reach the full (15kWh/m2.a; 0.6 ach @+-50pa) Passivhaus standard. It is a fantastic achievement, particularly as the building is a mid terrace in a conservation area, so there were many complex problems to overcome.

The second project is here in the south west. The client is North Devon Homes and the project, known as Barbrook, is currently on site. The site is much more challenging than our one so that, even though they are 'only' going for the EnerPHit standard, their project is every bit as challenging. I am looking forward to visiting Barbrook soon.

Sunday, 20 February 2011

Forming an airtight wall-ceiling junction

We have started to create the airtightness layer at various points in the building. In this post, I will describe the sequencing for one of our ceiling-wall junctions. The airtightness layer in this part of the build is formed by plaster on the wall and by Intello vapour barrier on the underside of the roof I-beams.

Stage 1) The Intello was stapled to the underside of the I-beams. Tescon tape was applied to join up each row of Intello. We also taped over the staples, in case the Intello is stretched and a small gap appears around the staples, although apparently this is not strictly necessary to achieve the Passivhaus 0.6 air changes per hour (ach) target.

Stage 2) In order to join the plaster to the Intello, we used Contega PV tape - half adhesive backed, half mesh. We had to use Tescon tape to stick the Contega to the Intello, as the Contega adhesive would not stick properly to the Intello. I had a very helpful conversation with Niall Crosson from Ecological Building Systems where he told me that if the Intello is exposed to humidity, it can affect its ability to stick to the Contega. I guess this must be because of the property of the Intello to vary its vapour permeability according to the ambient humidity.

Stage 3) After the first photo below was taken, an initial parge layer was applied under the Contega. We took care to put a kink along the length of the Tescon tape by pushing it up slightly, to allow for any possible future movement between wall and ceiling.



 Stage 4) Once it had dried, a second layer was applied to encase the mesh and the Contega tape above it. Then battens were screwed through the Intello to the I-beams. The Intello grips the screws and forms an airtight seal around them, which is only compromised if the screw is removed: it is vital therefore not to remove a screw if it has been incorrectly positioned - better to leave it in place. The space above the Intello (i.e. between the I-beams) is to be filled with Warmcel cellulose, so the battens will help the Intello support the weight of the Warmcel and will provide a 25mm service void to the ceiling plasterboard. 25mm is normally too narrow but I didn't want headroom to be reduced any more than is necessary in this attic space.


The remainder of the wall will be plastered later, along with the ceiling.

Thursday, 27 January 2011

Airtightness around existing floor joists (and along the top of internal walls)

The last few weeks has seen tremendous progress on the build and one issue that I wanted to focus on in this post is how we managed airtightness around the ends of the existing floor joists.

The picture below shows how the floor joists looked before. Normally, the block work would only be plastered above and below the joists, where the finished wall would be visible. In a Passivhaus refurbishment, the plastering needs to run continuously around the joists.


We had originally intended to keep the plasterwork below, if it was sound enough, but mostly it just fell off with minimal if any encouragement. As discussed in a previous post, water penetration in the cavity, due to poor detailing at the original roof-wall junction, together with some poor choices with the original render and paintwork seemed to have been the cause.

The issue of how to make airtight joist ends has been covered in this AECB YouTube video. One of the key points they mention is that the approach needs to take account of whether the wall is going to be insulated internally or externally. If a wall is to be internally insulated, there will be a significant temperature drop at the end of the joist, which brings a risk of condensation because the joist end sits within the cold wall. In the film, to avoid this, they have mounted the joists on joist hangers on an internally insulated wall. Steps then need to be taken to achieve airtightness around the joist hangers.

In our project, the existing house is being insulated on the outside, so the inner leaf of the existing cavity wall will be the same temperature as the inside - i.e. no condensation risk. This has been our approach to achieving airtightness around the joist ends:

Stage One

Carlite Bonding parging around the joists onto the original concrete block wall or sometimes new built sections of Thermalite block wall:


The same principle has been applied to a steel girder fabricated with an additional L-shaped piece, welded with the bottom of the L welded to the web of the girder. This means that the profile of the end of the girder is a solid rectangle, like a joist end, rather than an "I" profile, simplifying making it airtight.


Stage Two
Priming around the joist ends with Pro Clima's Tescon Primer adhesive. This helps to make sure the Tescon tape sticks to the plaster.


Stage Three

Taping around the joist and girder ends using Pro Clima's Tescon Profil tape.

 

Stage Four

Dotting the corners with Pro Clima's Orcon F adhesive. This is a "belt-and-braces" step. We were not absolutely sure that our tape corner junctions would stay completely airtight. We applied dots of Orcon F to be sure! 


Stage Five

Apply Unibond to the Tescon tape to provide a key for the second parge layer (next stage).

Stage Six

Apply a second parge layer to seal in the Tescon tape. In the picture below, the joist on the left was originally a double joist. We cut short the thinner of the two rather than try to treat the double joist along its length. Obviously, if the double joint were needed for structural reasons, we would not have been able to cut one joist back.

 
Dealing with the edge joists
The joists run north-south in our build. There was no edge joist on the east side due to the run of the original roof rafters, however the edge joist on the west wall was mounted close up against the wall and there wasn't enough space around the joist ends to parge and tape around them. One option was to wrap the entire length of the joist in Intello Plus membrane, then tape it down above and below the joist. We decided it was more practical to cut out the existing joist, reduce its length a few cm and re-attach it with coach bolts along its length of the west wall. We used resin anchor gel to secure the bolts in the wall but also applied a generous ring of Orcon F around each a penetration to provide a flexible airtight seal (picture below).


Tuesday, 18 January 2011

YouTube video of project

I've uploaded an interview about the project given in December about the project.

View it here: http://www.youtube.com/watch?v=EjNbNJ3YgfQ

Monday, 17 January 2011

Photos from weeks 9 and 10

I've uploaded photos of the build - weeks nine and ten - on flickr. Our progress was slowed down by the snow, but the team has been trying to catch up since the new year.

Sunday, 2 January 2011

Xmas and New Year update

It's been a while since I posted. The week-long installation of the scaffolding and 'tin hat' (photo below), the freezing weather and the Xmas/New Year break have meant that there is less to report. I feel very pleased that I didn't decide to skimp on getting a full 'tin hat' - I think it would have been very hard to make the progress we did during December without it. The project reached a turning point in December when we stopped removing bits of the existing building and started adding to it. December also saw a large outflow of money as I tied down as much of the spend on materials as possible before VAT goes up to 20% on 4th January. The rise in VAT further shifts the economic balance away from refurbishments in favour of new builds. Given that we have to address our existing housing stock if many of us are not going to faced with "heat or eat" choices in the coming decades, this policy choice of successive Lab-ConDem governments shows that, in practice, they are more concerned with the welfare of corporate big builders' interests than the citizens who elect them.

Saturday, 4 December 2010

Week 4 ends

Windows finally ordered on Wednesday. I managed to get the window spec selectively trimmed using PHPP to test what effect this would have on the building's performance. The PHPP paid for itself many times over just in this one week of 'optimising' the spec.

Getting to grips with Therm (also after a long struggle). The model of the external floor-wall junction I created, has produced a provisional psi value of 0.15W/mK, lower than the 0.2W/mK estimate I had previously. Putting that more accurate figure has trimmed another 0.5kWh/m2.a off our Annual Heat Demand. Helpful, as it allowed me to trim a bit more off the window spec.

I have a sense of having achieved quite a bit this week.

Meanwhile, the scaffolders have been busy by this time next week, the whole house will be shrouded in a tarp and tin weather shield that will protect the existing structure from the rain and provide a working environment for the site operatives more conducive to accurate and quality work. It also much reduces the risk of weather-related project delays. We have been lucky in that we have missed most of the bad weather affecting the rest of the country, although night time temps have dropped to as low as -10C. Even though we have not had much snow, it has not been nice weather to be working outdoors.


Monday, 29 November 2010

Week 4 begins ... the latest on windows and on thermal bridges

Windows

Week 4 starts and we Still Haven't Placed Our Window Order. The process of placing the order is taking a lot longer than I'd anticipated. I am optimistic that we will be in a position tomorrow, finally, to press the Go button.

This has all come as surprise to me, as I'd thought naively that we could spend time fine tuning our window spec, then present our carefully worked out window schedule to our helpful, local Internorm distributor who would then be able to process it quickly and simply ... no probs, job done.

I realise now that we should have sat down and gone through our schedule with the distributor and talked prices and options at least two months ago, despite not having planning permission or completely finalised window dimensions at that stage. The order process is slow because, while it is easy to spec out the windows for their required energy performance, there are so many other variables to consider and requirements to fulfil. One is the thickness of each pane of glass. If the glazed unit is over a certain area, 4mm glass has to become 6mm. For a given width of bead, this means 4mm less space between the panes, which has a significant impact on the U-value of the glazing. None of these are problems in themselves but overcoming them adds to the cost of the windows unnecessarily.

Better to use slightly less exacting window performance figures in the PHPP. That way, you can order standard products and get a much more cost effective solution. It seems obvious to me now that I am writing this and, in fact, I have used been using conservative figures throughout the PHPP but I think I got carried away by all the exciting "Leading Edge" or best case figures that the different window manufacturers banded about. Assuming your chosen window provider is in the business of manufacturing windows with near Passivhaus performance, the conversation needs to be about what their standard spec is on those windows. It also needs to be about whether window sizes or other variables will make it harder to achieve the energy performance you are planning for in the PHPP.

Here are my rules of thumb:


My "Leading Edge"
Spec Assumptions this time
More conservative PHPP
assumptions I will use next time
Glazing "g"-value 0.6 or 60% 0.5 or 50%
Glazing U-value 0.5W/m2K 0.6 or even 0.7W/m2K
Frame U-value
0.94W/m2K
0.94W/m2K
Spacer psi-value 0.038W/mK 0.05 or even 0.1W/mK

I got it right with the frame U-value, because I knew that the "leading edge" spec was a lot more expensive than their standard Passivhaus spec.

These figures aren't set in stone and I'm sure that each year what is considered standard "Passivhaus suitable" spec will improve.

Thermal bridging

On Thursday, I attended a one day course on how to use Therm, together with a very helpful Excel spreadsheet developed by Peter Warm, to calculate the psi-values of thermally bridged building junctions.

Therm is not at all intuitive but does have the advantage of being the only free software that can be used to derive a psi value for many types of thermal bridge. Therm can only model in two dimensions and more complex (and very costly) software needed to model certain types of thermal bridge junctions.

I have been grappling with this for some months but am now finally biting the bullet and getting to grips with Therm, so that we can replace the conservative (I hope) thermal bridge psi-values (0.2W/mK) we have used in the PHPP to quantify the additional heat loss through the floor-wall junctions of the existing house: this type of thermal bridge is unavoidable in a refurb but can be designed out in a new build.

Likewise, I want to model the junction between the existing house walls and the window jambs (sides), heads (top) and cills.

Meanwhile, the first insulation is being installed around the base of the walls of the existing building and in the base of the new build side extension.


We had to buy double quantities of the insulation in half thicknesses because, even though the thicker sizes do exist, the suppliers will only sell them in very large quantities, unsuitable for a project of our scale. I asked our builders to stagger them slightly to reduce possible thermal bridging in the inevitable, if tiny, gaps between each piece. So instead of this...



As we got around the corner, we started adding a 50mm overlap, like this...


It means a little bit of extra labour but it is essentially a free way to get the best from the insulation you are using. The images above are of the insulation around the base of the existing building, 2 x 60mm thick, which we are fitting from DPC level down about 400mm.

Installing dual layer of Foam Glas, under the toe of the concrete slab, where the weight of the walls of the new build will bear down - Foam Glas can take much heavier loads than other insulation  - we are also taking the opportunity of staggering the two layers to minimise unnecessary thermal bridging.



Later this week, the scaffolders will be here to start setting up the shroud that will cover the building for the next three months while the external wall insulation, the windows and the new roof are put in place.

Monday, 22 November 2010

More photos from Weeks 2 and 3 - a comment on cavity walls

More photos from the build here. I may add a couple more during this week. The one below (I can't get it to display correctly, sorry) shows the existing cavity wall insulation, which has become saturated due to water penetration from driving rain (we believe).
Exposed cavity
 We are planning to suck out all the existing insulation with a super powerful, industrial vacuum cleaner. Although the cavity will only be providing a small portion of the total insulative value of the new wall, we want to minimise the risk of gaps, which could allow air movement within the wall. It this happened, the U-value would be badly compromised. The replacement insulation (Instabead Graphite K32) has a significantly lower claimed conductivity value (0.033W/mK) than the rockwool (0.045W/mK).

Saturday, 20 November 2010

Week 2 of the build - "To refurbish or not to refurbish"

Week two has been quite eventful. The old windows are out and much progress made in digging trenches for the external insulation and preparing the foundation for the new build element to the side of the house.

All (I hope) of the shortcomings of the existing building have now been exposed and this week I have found myself questioning why we are bothering to refurb and not demolishing what is left and starting again. If we had chosen to demolish it, we would have been able to do away with many hours of difficult design work. The problems of thermal bridging between the ground floor concrete slab and the structural walls would have gone away in an instant. We wouldn't be paying tens of thousands in VAT, as VAT can be claimed back for new builds.

Our builder mentioned as an aside that we could have brought in a big machine that, in no time at all, would have crunched up the concrete that makes up so much of the mass of the existing building. We could have sold it for hardcore at £3 or £4 a bag. This is a good point against the pro-refurbishment argument about saving embodied energy, as the energy in the crunched up concrete would still have had a use in the future, if we'd gone down the new build route.

Despite that, I still strongly believe there is tremendous value in what we are doing. Even if the economics in our case is likely to be marginal, there will be many lessons to be learned from this project for us personally and, I hope, for others for whom refurbishment is the only option.


We still haven't placed our window order and I am now getting quite nervous about it. Having spent so much time and effort optimising our spend and the work programme, I can see money being wasted because of the delays in finalising the windows.


During the week a gas leak was discovered and the site was temporarily evacuated until the leak was provisionally patched up. The local gas infrastructure company is coming back early next week to replace all the pipework from the street to the house. The old pipe was completely rusted away and, as soon as it was exposed, began to leak a lot of gas. It amazes me that a house that was built on a green field site 40 years ago could have been connected to the gas grid with pipework that had no chance of lasting. I have to assume that the gas has been slowly seeping through the ground for many years and that our situation is far from uncommon. If that's true, not only have we been building homes that waste energy hugely, the gas grid itself is wasting gas before it even reaches our gas meters.

Sunday, 14 November 2010

Week One photos

I've uploaded some photos of this week's activity here.

Removing all the ceilings has underlined what a big task it will be to make airtight all the junctions with the existing ceiling joists on two floors. The plastering will go up around and between the joists with additional work using Pro Clima airtightness products around each joist.